Prepare a Drawing Package

Drawing-based transmission parts are coordinated alongside standard and branded items. Give each custom part an unambiguous drawing reference before machining feasibility and quotation review.

A drawing package with a clear revision basis

The drawing, manufacturing requirements and inspection basis form one controlled specification.

Drawing identity

  • Part number
  • Drawing revision
  • Issue date and file set

The agreed revision identifies the technical basis for the request.

Part definition

  • Material and treatment
  • Critical dimensions and tolerances
  • Surface and interface requirements

Manufacturing review follows the requirements stated in the drawing package.

Inspection basis

  • Critical characteristics
  • Inspection method, where agreed
  • Records required by the order

Acceptance requirements are aligned with the features that affect fit and function.

Revision changes

  • Changed requirements
  • Affected quantities or batches
  • Updated confirmation record

A revised file is linked to its effect on scope, price and delivery.

Identify the governing revision

Put drawing number, revision and part name on the BOM line. Identify superseded files and state which revision should be quoted. Avoid sending several similarly named files without this instruction.

Keep geometry and requirements together

Include dimensions, tolerances, material, finish and thread details in the controlled package. Where a model and a dimensioned drawing differ, clarify the governing requirements.

Mark critical acceptance features

Identify features that require particular inspection and specify the requested record. A marked critical dimension is more useful than a general request for high quality without an acceptance criterion.

Separate quantities and stages

State the quantity per part and whether the request concerns samples, a first batch or repeat supply. Feasibility, inspection scope and delivery are reviewed for the actual package.

Request basis

Details linked to the component list.

  • Drawing number and revision
  • Material and finish
  • Critical dimensions and acceptance criteria
  • Quantity per part

Existing documents remain useful.

BOMs, model lists and drawings can form the starting point; open specifications stay marked for review. Submitted inquiries and attachments are saved to ZOFANG’s server for review.

Continue preparing

Related procurement guides.

Keep technical details and purchasing instructions connected.