Drawing identity
- Part number
- Drawing revision
- Issue date and file set
The agreed revision identifies the technical basis for the request.
Drawing-based transmission parts are coordinated alongside standard and branded items. Give each custom part an unambiguous drawing reference before machining feasibility and quotation review.
The drawing, manufacturing requirements and inspection basis form one controlled specification.
The agreed revision identifies the technical basis for the request.
Manufacturing review follows the requirements stated in the drawing package.
Acceptance requirements are aligned with the features that affect fit and function.
A revised file is linked to its effect on scope, price and delivery.
Put drawing number, revision and part name on the BOM line. Identify superseded files and state which revision should be quoted. Avoid sending several similarly named files without this instruction.
Include dimensions, tolerances, material, finish and thread details in the controlled package. Where a model and a dimensioned drawing differ, clarify the governing requirements.
Identify features that require particular inspection and specify the requested record. A marked critical dimension is more useful than a general request for high quality without an acceptance criterion.
State the quantity per part and whether the request concerns samples, a first batch or repeat supply. Feasibility, inspection scope and delivery are reviewed for the actual package.
BOMs, model lists and drawings can form the starting point; open specifications stay marked for review. Submitted inquiries and attachments are saved to ZOFANG’s server for review.
Keep technical details and purchasing instructions connected.
Make a mixed component list easier to review without forcing every item into the same specification format.
View detailsPreserve the identification details needed to source customer-specified brands and models.
View detailsAgree what is to be checked and what evidence is needed before the order is confirmed.
View detailsCompare shipment arrangements against the actual readiness and urgency of each item.
View detailsMake repeat purchasing traceable to the approved item details rather than a previous order description alone.
View details