Integrated supplier of transmission components · Since 2008China-made supply · Brand distribution · Custom parts
ZOFANG 轴方传动
Transmission procurement guide

Define Inspection & Acceptance

Each transmission component is matched to its agreed specification and inspection basis. Agree what is to be checked and what evidence is needed before the order is confirmed.

Acceptance connects requirements, checks and records

The inspection scope and available documents depend on the product and the agreed order requirements.

Agreed basis

  • Confirmed model or drawing
  • Applicable revision
  • Critical acceptance requirements

The order specification establishes what is to be verified.

Verification items

  • Identity and quantity
  • Dimensions or appearance, as agreed
  • Packaging and identification

Checks are selected for the product and the agreed inspection scope.

Document scope

  • Inspection records, where agreed
  • Material or treatment records, if required
  • Packing and item information

Document availability and scope are confirmed for the specific item.

Delivery record

  • Item and batch association
  • Agreed deviations, if any
  • Dispatch documentation

The resulting records stay associated with the relevant delivery.

Name the item and requirement

Link every inspection request to a BOM line or drawing feature. Separate model and quantity verification from dimensional, material or functional requirements.

Define the acceptance basis

Provide the governing drawing, specification or agreed reference. Identify tolerances, sampling requirements and any required method where these form part of your acceptance criteria.

Request specific records

List the required document or record for each item. Document availability and any additional inspection need confirmation; no certificate or test capability is implied by a general sourcing request.

Agree how exceptions are handled

State who reviews a discrepancy and whether shipment must wait for approval. Record approved changes against the affected item rather than using an undocumented verbal substitution.

Request basis

Details linked to the component list.

  • Item-specific inspection scope
  • Governing revision and acceptance limits
  • Required records
  • Exception and release approval

Existing documents remain useful.

BOMs, model lists and drawings can form the starting point; open specifications stay marked for review. Submitted inquiries and attachments are saved to ZOFANG’s server for review.

Continue preparing

Related procurement guides.

Keep technical details and purchasing instructions connected.