Agreed basis
- Confirmed model or drawing
- Applicable revision
- Critical acceptance requirements
The order specification establishes what is to be verified.
Each transmission component is matched to its agreed specification and inspection basis. Agree what is to be checked and what evidence is needed before the order is confirmed.
The inspection scope and available documents depend on the product and the agreed order requirements.
The order specification establishes what is to be verified.
Checks are selected for the product and the agreed inspection scope.
Document availability and scope are confirmed for the specific item.
The resulting records stay associated with the relevant delivery.
Link every inspection request to a BOM line or drawing feature. Separate model and quantity verification from dimensional, material or functional requirements.
Provide the governing drawing, specification or agreed reference. Identify tolerances, sampling requirements and any required method where these form part of your acceptance criteria.
List the required document or record for each item. Document availability and any additional inspection need confirmation; no certificate or test capability is implied by a general sourcing request.
State who reviews a discrepancy and whether shipment must wait for approval. Record approved changes against the affected item rather than using an undocumented verbal substitution.
BOMs, model lists and drawings can form the starting point; open specifications stay marked for review. Submitted inquiries and attachments are saved to ZOFANG’s server for review.
Keep technical details and purchasing instructions connected.
Make a mixed component list easier to review without forcing every item into the same specification format.
View detailsPreserve the identification details needed to source customer-specified brands and models.
View detailsGive each custom part an unambiguous drawing reference before machining feasibility and quotation review.
View detailsCompare shipment arrangements against the actual readiness and urgency of each item.
View detailsMake repeat purchasing traceable to the approved item details rather than a previous order description alone.
View details